Grues semi-portiques is a small or middle crane, widely used in mechanical processing workshops for materials handling, endroit extérieur, et entrepôt pour le chargement et le déchargement.

TaperBMH, BMG
Capacité de levage2 à 80 tonnes
Hauteur de levageHauteur de levage personnalisée
Portée 8 m à 20 m
Vitesse de levage6 to 11.5m/min
Vitesse de fonctionnement du chariot20 to 40m/min
Vitesse de fonctionnement de la grue20 à 40 m/min
Devoir de travailA3,A4,A5,A6

Introduction

Semi Gantry Crane is a kind of crane material handling equipment that runs on rails, which can be used outside the factory building for loading and unloading materials.

Bridge cranes are usually used inside the plant, but if your plant uses a bridge crane, or because the steel structure of the factory can only be installed on one side of the steel structure, then this kind of semi-gantry crane can be used instead for a long time.

Since one side of the semi-gantry crane needs the top steel structure to support, the requirements for the multi-user environment will be higher than other overhead cranes, such as gantry cranes or overhead cranes.

Que pouvons-nous vous offrir?

We can provide you with a common semi gantry crane with a lifting weight of 1 tonne à 80 tonnes, a span of 8m to 20m, a lifting height of 6m to 20m, and working duty (A3, A4, A5, A6).

Custom Design Semi Gantry Crane

The above semi gantry crane parameters are only common parameters if they can’t meet your needs.

WeiHuaCrane also provides customized design gantry crane services you can leave your needs, our designers will design the best material handling equipment for you.

The main purpose of Semi Gantry Crane?

Semi Gantry Crane is a kind of light and small material handling equipment that runs on rails.

Utilisé avec des palans électriques tels quepalan à câble à une vitesse (CD1) etpalan à câble à double vitesse (MD1).

Principaux lieux d'utilisation: manutention de matériaux à différentes occasions telles que les ateliers de production mécanique, des usines, entrepôts, parcs à bestiaux, etc..

Semi gantry cranes cannot be used in special flammable, explosif, et environnements corrosifs (matériel spécial de manutention).

Si vous êtes dans un secteur particulier, veuillez écrire votre secteur d'activité lorsque vous laissez un message, et nos ingénieurs personnaliseront un portique répondant aux normes de votre industrie.

Caractéristiques

  1. La grue a une structure simple et compacte;
  2. Il est facile à installer et à utiliser;
  3. Il nécessite moins d’entretien et est facile;
  4. Il a un poids mort léger;
  5. Il peut être personnalisé en fonction des besoins de travail particuliers;
  6. La grue fonctionne de manière fiable et efficace sans panne lors des travaux de levage;
  7. Il peut être utilisé pour de nombreuses occasions de travail différentes, y compris les occasions intérieures et extérieures;
  8. La grue est fournie à un prix très raisonnable.

Avantages de la grue WeiHuaCrane

  • Un service plus professionnel: Si vous ne savez pas comment personnaliser, notre responsable commercial vous aidera à choisir le produit le plus adapté à vos besoins;
  • Le meilleur pour toi: les ingénieurs professionnels personnalisent les produits en fonction de votre environnement utilisateur;
  • Meilleur prix: Selon votre environnement utilisateur, etc., nous vous donnerons le produit le plus adapté, sauvegarder les fonctions inutiles, et vous aider à économiser de l'argent;
  • Hauteur de levage personnalisée: Selon vos besoins, la hauteur de levage peut être personnalisée pour vous, qui peut être étendu, réduit, etc., ce qui vous convient le mieux;
  • Fonction personnalisée: une télécommande sans fil peut être installée, ce qui est plus pratique à utiliser;
  • Modifier l'alimentation: vous pouvez modifier l'alimentation (tension, fréquence, etc.) selon votre environnement;
  • Installation sur site: Inquiet des erreurs d'installation, nous pouvons l'installation et la mise en service sur site;
  • Conseils: Nous fournissons des vidéos d'utilisation et des manuels de maintenance détaillés;
  • Remplacement des pièces vulnérables: des pièces plus vulnérables sont fournies afin que votre grue puisse être remplacée dans un premier temps lorsqu'elle est usée;
  • Les pièces sont traitées séparément: après une utilisation à long terme, si certaines pièces sont endommagées, nous traiterons ces pièces pour vous et vous les enverrons;

Scénarios d'application

Semi-gantry cranes can be used in stations, wharves, entrepôts, chantiers de marchandises, sites de construction, cement products yards, machinery or structural assembly yards, hydropower stations, and other open-air work sites for lifting, transportation, chargement, and unloading, and can also be used in indoor workshops.

Structure principale et fonctionnalité

The semi gantry crane is mainly composed of four parts: bridge frame, cart operating mechanism, hoisting mechanism, and electrical.

Pont

The bridge frame of the semi gantry crane is mainly composed of the main girder, upper girder, lower girder, stabilisateur, and ladder platform.

Poutre principale

  1. The main girder of the semi gantry crane is the main load-bearing component of the hoist crane, and it is also the running track for the suspension of the electric hoist
  2. The main girder of the semi gantry crane is formed by welding a U-shaped groove formed by cold bending of steel plate and I-steel.
  3. The steel plate material of the semi gantry crane is Q235B or Q345B (similar to foreign steel Fe37 or Fe52)
  4. The camber F of the main girder of the semi gantry crane should be (1/1000~1.4/1000)S, and the maximum camber shall be within the range of S/10 in the middle of the span.
  5. The electric hoist trolley of the semi gantry crane runs on the I-beam flange. When the hoist is in the middle of the main girder, the full-load natural vibration frequency of the main girder is not less than 2Hz.
  6. The two ends of the main girder of the semi gantry crane are equipped with buffers to ensure the safe operation of the trolley on the main girder.

Upper beam, lower beam

  1. The upper and lower beams of the semi gantry crane are the foundation for supporting the main beam and the load, as well as the link between the main beam and the running mechanism, and are one of the main load-bearing components of the crane metal structure
  2. The semi gantry crane is mainly tailor-welded by steel plates into a box-shaped structure, which is light in structure, good in rigidity, beautiful in appearance and good in welding process performance
  3. Buffers are provided at the end of the beam of the semi gantry crane
  4. The upper beam of the semi gantry crane is arranged above the upper rail, and the lower beam is arranged above the lower rail.
    PS: En général, the lower beam is longer than the upper beam, and the difference in length depends on the length and angle of the outriggers.

Landing Leg

  1. The outriggers of the semi gantry crane are composed of upper flange, lower flange and box-shaped support columns assembled by steel plates.
  2. The upper flange of the semi gantry crane is large and the lower flange is small, so that the outriggers become a variable cross-section structure with a large upper and a small lower section, which can effectively carry vertical and horizontal loads.
  3. The main beam and the upper cross-end beam of the semi gantry crane are contacted by a bolt plus/minus load flange hanging contaction structure. The structure is simple, the installation is convenient, and it is convenient for transportation and storage.
  4. The main girder of the semi gantry crane and the two legs symmetrically arranged on both sides of the main girder are fastened by bolts to the two flanges, and the two legs are narrowed up and wide down to form a certain angle to form an “UN” The font structure improves the stability of the crane.
  5. The outriggers of the semi gantry crane and the lower beam are contacted by bolts.

Ladder Landing

The ladder platform of the semi gantry crane is welded by angle steel, flat steel, round steel, etc., and is contacted with the angle steel welded on the outrigger through bolts, avoiding on-site welding and making it easy to disassemble.

Crane Travelling Mechanism

The trolley running mechanism of the semi gantry crane is driven separately, which is mainly composed of a running motor, a running reducer, and a wheelset. The whole device is simple in structure, de petite taille, low in noise, generous in appearance, safe and reliable in use, and convenient in installation and maintenance.

Moteur

The trolley running mechanism of the semi gantry crane adopts the ZDY series brake type motor, and the motor has its own brake for reliable braking. The motor is arranged above the lower beam to save space.

Réducteur

The trolley running mechanism of the semi gantry crane adopts the LDAC or LDHC type verticalthree-in-one” réducteur + open gear transmission type, the reducer is small in width, and there is no coupling.

Roue

  1. The trolley running mechanism of the semi gantry crane adopts LDA type wheels with double wheel edges, which is not easy to cause the wheel climbing and falling off the track.
  2. The end baffle of the cross beam of the trolley running mechanism of the semi gantry crane is contacted by bolts, which is detachable and convenient for installation and maintenance.

Mécanisme de levage

Electrical Parts

  1. The electrical part of the semi gantry crane adopts a pressure type lifting limiter, an alarm point is set, the sensor is directly installed on the wire rope, and the original wire rope structure is retained. The control instrument can be installed together with the sensor, or separately installed in an electrical cabinet or other Location
  2. The electrical part of the semi gantry crane is easy to install and debug, stable in quality, intelligent, and small in size.

Mode d'alimentation

Alimentateur de grue:

(1) fil coulissant de sécurité

(2) câble souple

(3) tambour de câble

Alimentateur sur chariot:

(1) poulie à câble

La glissière du câble souple et de la poulie de câble pourrait être une glissière à câble métallique, Glissière en poutre ou glissière en acier déformé.

Fils et câbles

Fils et câbles avec cuivre, gaine multibrins et isolante utilisée partout dans la grue

Câble simple multibrin, dont la zone transversale du fil de commande≥1,5 mm2 et du câble multicœur multibrins de 1,0 mm2, zone transversale de la ligne électrique≥2,5 mm

Les câbles posés dans des goulottes ou des tubes d'une épaisseur de 1,5 mm à 2 mm

Dispositifs de protection sur les parties des blessures mécaniques, corrosion chimique, or soil erosion

Mode de contrôle

Pendentif: contrôler les actions de tous les mécanismes en appuyant sur les boutons

Télécommande: contrôler les actions de tous les mécanismes avec une télécommande industrielle

Contrôle cabine: contrôler les actions de tous les mécanismes avec les boutons, interrupteurs principaux, contrôleur de came, ou attelage en cabine

La grue pourrait également avoir deux ensembles de dispositifs de commande, comme un pendentif + télécommande ou cabine + télécommande. Deux modes de contrôle ne peuvent pas être utilisés ensemble pour des raisons de sécurité.

Système de protection électrique

Short circuit protection

Disjoncteur automatique dans le circuit d'alimentation principal comme protection contre les courts-circuits du circuit de commande de la grue.

Protection contre les pertes de tension

La structure du circuit a une fonction de protection contre les pertes de tension, le bouton de démarrage doit être enfoncé pour redémarrer la grue lors du rétablissement de l'alimentation après une coupure en cas de fonctionnement automatique de la grue.

Interrupteur d'alimentation d'urgence

  1. Interrupteur d'alimentation de secours à réinitialisation rotative, semblable à un champignon rouge, utilisé pour couper rapidement l'alimentation en cas d'urgence;
  2. Emergency power switch set in convenient place.

Limiteur de surcharge

Le limiteur de surcharge enverra un signal d'alarme lorsque la charge atteint 90% capacité nominale

L'alimentation électrique pour le levage sera coupée avec un signal d'alarme prohibitif lorsque l'on atteint 110% capacité nominale

Le capteur est relié au boîtier de commande, étanche à l'humidité et antisismique, anti-interférence.

Limiteur de position

Limiteur d'incendie dans le mécanisme de levage comme interrupteur pour limiter la hauteur de levage, en même temps, protéger le contrôleur

Limiteur de déplacement dans le mécanisme de déplacement de la grue, composé d'un fin de course de déplacement sur la grue et d'une règle de sécurité à l'endroit où l'on sort du déplacement de la grue, assurer le déplacement en toute sécurité de la grue.

Une pince de rail coupe-vent est installée à une extrémité de la poutre au sol lorsqu'elle est utilisée à l'extérieur. L'interrupteur de fin de course sur rail se verrouille avec l'interrupteur d'alimentation principal., c'est-à-dire, la grue n'a pas pu démarrer lorsqu'elle est verrouillée sur le rail par le collier de serrage.

Position zéro et protection de verrouillage

La grue de commande de cabine a une position zéro et une fonction de protection par verrouillage

Zero position protection prevent the motor automatic operating when restoring power after power off, avoiding accidents

The interlocking of the door and switches avoid accidents like people or objects falling down from the door when the crane starts suddenly as the door opens.

Défaut triphasé & protection contre les défauts de tension

Le système de protection complet en circuit coupe automatiquement l'alimentation principale en cas de défaut triphasé ou de tension en cas de dommages aux personnes et à l'équipement..

Protection du sol

Metacor de grue et coque métallique, chemin de roulement, le côté bas du transformateur des équipements électriques est tous mis à la terre. Total grounding resistance≤4Ω, and the crane rails could be as a ground wire. Résistance d'isolation à la terre≥1MΩ à température normale (it is a measured value of 500V megger at normal temperature).

Semi Gantry Crane Parameters

CapacitéPortéeHauteur de levageVitesse de levageVitesse du chariotVitesse de la grueDevoir de travailType de piste
S(m)mm/minm/minm/min
5 tonne12~306~1211.537.237.7A3~A6P43
10 tonne12~306~128.537.437.7A3~A6P43
16 tonne12~306~127.940.140.1A3~A6P43 QU70
20 tonne12~306~127.24040.1A3~A6P43 QU70
32 tonne12~306~1263738A3~A6P50 QU80

Envoyez-nous un message

Afin de personnaliser les dessins de conception et le dernier prix pour vous dès que possible, veuillez remplir autant d'informations utiles que possible dans le message.

Après avoir reçu votre message, nos ingénieurs vont d'abord personnaliser le Grue semi-portique et réalisez des dessins de conception pour vous en fonction de vos besoins, puis le responsable commercial vous fournira le prix et vous contactera. S'il vous plaît, attendez.

Bien sûr, vous pouvez également envoyer ces informations à notre email: [email protected].

Afin de vous fournir rapidement des tarifs et des plans, veuillez remplir le message dans la mesure du possible: ⭐Capacité de levage; ⭐Hauteur de levage; ⭐Portée(m);⭐Alimentation: __v/__phase/__Hz, etc.; Si vous avez d'autres informations, comme 1️⃣. Quels matériaux la grue soulèvera-t-elle? 2️⃣. Longueur du voyage: m? Avez-vous besoin de nous pour vous fournir le rail? 3️⃣. condition ou environnement de travail de la grue? 4️⃣. combien de mètres parcourt votre grue? 5️⃣. combien d'heures ça marche par jour?

Grues associées

Capacité de la grue